Structural Engineering Cost & Timeline Guide

Last updated: · Typical ranges; every project is quoted individually

Short answer: a structural engineering package from LPL Consultants typically costs $3,000–$10,000 for an ADU and $8,000–$25,000+ for a California custom home, and takes 2–5 weeks from kickoff to permit-ready drawings. Multifamily projects run from about $10,000 for a duplex to $40,000–$80,000+ for a 20-unit building, with 4–14 week schedules. Building department plan check is extra time on top — from 2 weeks to several months depending on the city.

Typical structural engineering fees by project type

Every project is quoted individually with an itemized, clear-scope proposal and no surprise add-ons.

How long structural engineering takes

Typical timelines from project kickoff to permit-ready drawings, assuming architectural plans are complete when we start:

Project typeTypical timeline
Simple ADU (detached, flat site)2 – 3 weeks
Attached, second-story or hillside ADU4 – 6 weeks
Custom home3 – 5 weeks
Small multifamily4 – 6 weeks
Mid-rise or complex multifamily8 – 14 weeks
Hillside projectsAdd 1 – 2 weeks for geotechnical coordination

Incomplete architectural plans at kickoff extend structural timelines. Projects with standard conditions (flat site, typical foundation, no unusual structural features) can sometimes be fast-tracked for an expedite fee.

Plan check time after submittal

Once the structural package is submitted, building department plan check times vary significantly by jurisdiction — from about 2 weeks (over-the-counter in some cities) to 4–6 months (Los Angeles LADBS for complex projects). LPL's proposals include a defined number of plan check response rounds — typically one or two — and we respond to structural comments directly. See structural engineering for permits.

What drives the cost

  • Square footage and complexity — larger and more complex structures need more analysis and drawings.
  • Site conditions — hillside sites and difficult soils need additional foundation analysis.
  • Existing structure — attached ADUs, additions and garage conversions require evaluating what's already built.
  • Number of plan check cycles anticipated by your building department.
  • Geotechnical report — whether one is provided affects foundation scope.
  • State and building department — seismic design in CA, WA and OR and hurricane wind design in FL and TX each carry their own requirements.

How to get an accurate quote

Send us the project address, architectural plans (schematic-level is fine at the quote stage), the project type, and the building department you'll be submitting to. If you have a geotechnical report, include it. Request a quote and we'll respond within one business day.

Cost and timeline questions

How much does structural engineering cost for a custom home in California?

Structural engineering fees for a California custom home typically range from $8,000 to $25,000 depending on square footage, site complexity (flat vs. hillside), number of plan check cycles anticipated, and whether a geotechnical report is provided. LPL provides itemized proposals so you know exactly what's included.

How much does structural engineering cost for an ADU?

A straightforward detached ADU structural package typically ranges from $3,000 to $7,000. Attached ADUs, second-story ADUs, and garage conversions that require existing structure evaluation are typically $4,000 to $10,000. Site complexity, state, and building department requirements affect cost.

How much does multifamily structural engineering cost?

Multifamily structural fees scale with project size and complexity. A duplex or small triplex may start around $10,000–$15,000. A 20-unit wood-frame apartment building typically ranges from $40,000 to $80,000+. Podium structures, post-tensioned concrete, and mid-rise steel are priced on a project-specific basis. LPL provides proposals with clear scope and no surprise add-ons.

Do you charge for plan check response?

LPL's proposals include a defined number of plan check response rounds — typically one or two. Additional rounds beyond what's included are billed at our hourly rate. We'll tell you what's included upfront, and we work hard to minimize plan check comments through thorough initial submittals.

How long does structural engineering take?

Typical timelines from project kickoff to permit-ready drawings: ADU (simple): 2–3 weeks. Custom home: 3–5 weeks. Multifamily (small): 4–6 weeks. Multifamily (mid-rise or complex): 8–14 weeks. Hillside projects: add 1–2 weeks for geotechnical coordination. These assume architectural plans are complete when we start. Incomplete architectural plans at kickoff extend structural timelines.

Can you fast-track a structural package?

Yes, in some cases. If your project has standard conditions (flat site, typical foundation, no unusual structural features), we can prioritize it in our schedule for an expedite fee. Contact us to discuss your timeline needs and we'll tell you honestly what's achievable.

Get a clear scope and fee

Send your plans and project address — we'll reply within one business day with scope, timeline and fee.

Request a Quote